Operating duty: Design input
Write tank diameter, length, mass, material, weld process, seam list and whether every required seam must be reached without a manual reposition. Include representative production samples or drawings of the worst-case nozzle cluster. Throughput must be stated with those samples, not as a brochure units-per-hour figure. Work envelope and footprint must match the shop crane path and the rolling mill or fit-up station that feeds the cell.